This two-phase project for the Outokumpu Manufacturing facility included a 50,000 SF processing facility and a 60,000 SF heat treat facility for stainless steel. The project included all associated site work and required extensive soil remediation due to unsuitable soils.
Delivered through CM at Risk, the first phase consisted of 42,750 SF of production space and 6,000 SF of new office space.
For the second phase, major project elements included mass-grading, concrete pavement, segmented block retaining wall, concrete foundations and formed trenches for owner equipment, and the pre-engineered building supporting two overhead cranes. Twelve exterior overhead door openings and two interior high-speed doors were included in the scope. Additionally, an 8,000 SF metal stud framed interior office space with conference room, offices, breakroom, and locker space was provided.
Founded over 40 years ago, J.M. Cope is one of the region’s most respected commercial construction firms. Focused on building leaders who build community, we proudly serve clients in commercial, education, faith-based, historic tax credit, hospitality, industrial, manufacturing, interiors, medical office, and municipal markets.