The South Carolina Inland Port in Greer serves as a rail-connected inland cargo hub, linking local industries directly to the Port of Charleston and global trade routes. To support the Port’s growing operational demands, the project included development of a 7-acre site for a two-story, 9,122-square-foot Terminal Operations Building, along with a 4.5-acre chassis storage lot.
Located outside the security gates, the conventionally framed steel facility features both public and private entrances and provides Port staff with office space, conference rooms, locker and break rooms, a walkout patio, and a rooftop terrace overlooking the property. Site improvements also included the installation of trees and shrubs to restore and enhance the landscape following construction.
Together, the new terminal facility and chassis lot improve operational efficiency while providing ample capacity for future growth.