Partial demolition of existing entryway and construction of two new ADA ramps and entrances including brick veneer and decorative steel railings. Also included is a 8,200 SF interior renovation consisting of demolition of existing partitions and installation of a new corridor and bulkheads to open the lobby space, followed by new flooring and wall finishes.